Under the full load of the three engines, 5.5 t/h of saturated steam are produced at 10 baro and can be fed into the industrial plant’s steam network. The total thermal output is 3.6 MW; the exhaust gas mass flow is 11,157 kg/h per engine.
Despite the restrictions imposed as a result of the coronavirus crisis, commissioning was carried out professionally on site. Modem access to the control system permits plant fine-tuning directly from the APROVIS headquarters in Germany.